Min. Order Reference FOB Price
1 Piece US$40.00-60.00 / Piece
Product Description
Low Price Durable Plastic PVC Mechanical Water Rotameter For Reverse Osmosis LZS-E/G Polysulfone (PSU) or PC body, Fittings Made of PVC ABS or SS Float Capable of Withstanding Higher Temperatures. Thread Joint And Panel - Mounted Fittings Are Easy To Install, Economical And Endurable. The Flowmeter ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | US$40.00-60.00 / Piece | US$5.00-19.00 / Piece | US$120.00-160.00 / Piece | US$3.00-15.00 / Piece | US$439.00-999.00 / Piece |
| Min Order | 1 Piece | 1 Piece | 1 Piece | 1 Piece | 1 Piece |
| Payment Terms | - | - | LC, T/T, Western Union | - | LC, T/T, D/P, PayPal, Western Union | Quality Control |
| Product Certification | JIS, DIN, ANS, GB, CE, RoHS, ISO | GB, CE | JIS, CE, ISO | GB, CE | CE, ISO |
| Management System Certification | - | - | - | - | - | Trade Capacity |
| Export Markets | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe | - | North America, Europe, Southeast Asia/ Mideast | - | North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic |
| Annual Export Revenue | - | - | - | - | - |
| Business Model | - | - | Own Brand, ODM, OEM | - | Own Brand, ODM, OEM |
| Average Lead Time | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: one month | - | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: within 15 workdays | - | Peak Season Lead Time: within 15 workdaysOff Season Lead Time: within 15 workdays | Product Attributes |
| Specification | |||||
| Supplier Name |
Hefei Siko Instruments Co., Ltd.
|
Guangzhou Frotec Water Treatment Co., Ltd.
|
China Baotai Science and Technology Co., Ltd.
|
Guangzhou Frotec Water Treatment Co., Ltd.
|
Shanghai Boqu Instrument Co., Ltd.
|