Min. Order Reference FOB Price
1 Set US$50,000.00-1,000,000.00 / Set
Product Description
Product Description Fuel Cell Production Line Focusing on the precision assembly and testing of fuel cell stacks and systems, we possess core technologies such as hydrogen safety control and membrane electrode alignment, offering green and low-carbon solutions with strong adaptability. AGV ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | US$50,000.00-1,000,000.00 / Set | US$32,750.00 / Set | US$32,750.00 / Set | US$32,750.00 / Set | US$32,750.00 / Set |
| Min Order | 1 Set | 1 Set | 1 Set | 1 Set | 1 Set |
| Payment Terms | LC, T/T, D/P, PayPal, Western Union, Small-amount payment | LC, T/T, D/P | LC, T/T, D/P | LC, T/T, D/P | LC, T/T, D/P | Quality Control |
| Management System Certification | ISO9001:2015, ISO45001:2018, ISO14001, Others | - | - | - | - | Trade Capacity |
| Export Markets | Domestic | South America, Europe, Southeast Asia/ Mideast, Africa, Domestic | South America, Europe, Southeast Asia/ Mideast, Africa, Domestic | South America, Europe, Southeast Asia/ Mideast, Africa, Domestic | South America, Europe, Southeast Asia/ Mideast, Africa, Domestic |
| Annual Export Revenue | - | - | - | - | - |
| Business Model | ODM, OEM | Own Brand, ODM, OEM | Own Brand, ODM, OEM | Own Brand, ODM, OEM | Own Brand, ODM, OEM |
| Average Lead Time | Peak Season Lead Time: 1-3 monthsOff Season Lead Time: one month | Peak Season Lead Time: 3-6 monthsOff Season Lead Time: 3-6 months | Peak Season Lead Time: 3-6 monthsOff Season Lead Time: 3-6 months | Peak Season Lead Time: 3-6 monthsOff Season Lead Time: 3-6 months | Peak Season Lead Time: 3-6 monthsOff Season Lead Time: 3-6 months | Product Attributes |
| Specification | |||||
| Supplier Name |
Shengerxin Technology (Chongqing) Co., Ltd.
|
Zhengzhou Duoyuan Automobile Equipment Co., Ltd.
|
Zhengzhou Duoyuan Automobile Equipment Co., Ltd.
|
Zhengzhou Duoyuan Automobile Equipment Co., Ltd.
|
Zhengzhou Duoyuan Automobile Equipment Co., Ltd.
|