| Specification |
After-sales Service: Online Service;
Warranty: 1 Year;
|
After-sales Service: Yes;
Warranty: 1 Year;
Testing Material: Aggregate;
Rotating Speed: 30 - 33r/Min;
Standard: ASTM C131;
Operation Mode: Automatic;
Application: Construction Industry,Lab,etc;
Power Supply: 220V/380V 50Hz;
Material: Thick Steel;
Warranty Period: 1 Year;
|
After-sales Service: Response in 12 Hours;
Warranty: 1 Year;
Test Standard: ASTM D86;
Power Supply: AC(220±10%)V, 50Hz;
Total Power Consumption: 5400W;
Receiving Cylinder: 100ml;
Distillation Flask: 125ml;
Dimension: 700mm×520mm×580mm;
Net Weight: 60kg;
Display: LED;
Material of Flask Support Board: Sic;
Working Position: Two Units;
Color: White;
Temp.Control Range: 0 ℃ to 60 ℃;
OEM Service: Available;
Refrigeration Mode: Air Compressor;
|
After-sales Service: Online Training for Operation and Installation;
Warranty: One Year;
Description: Load Loss 30kVA 3150kv Transformer Test Equipment;
Application: Test Transformer Capacity, Load Loss, etc.;
Application Field: Electrical Industry, Transformer Manufacturer, etc;
Test Parameters: Capacity, Transformer Type, Loss Current, etc.;
Features: 30kVA 3150kv Transformer Load Loss Test Equipment;
Applicable Transformer: All Kinds of Transformer;
Capacity Test Range: 30kVA - 3150kVA;
AC Voltage: 10-650V;
AC Current: 0.5-60A;
Data Storage: 500 Groups;
Net Dimension: 40cm*30cm*22cm;
Net Weight: 8kg;
Packing Dimension: 55cm*45cm*40cm;
Gross Weight: 18kg;
Power Supply: 220V, 50Hz/60Hz;
|
After-sales Service: Online Training for Operation and Installation;
Warranty: 365 Days;
Description: Winding Deformation Transformer Test Equipment;
Functions: Detect The Deformation of The Transformer.;
Application Field: Electrical Industry, Transformer Servicer;
Test Objects: Transformers, Generators;
Features: Winding Deformation Transformer Test Equipmen;
Operation Mode: Through Large LCD Touch Screen;
Linear Sweep: 10Hz-2MHz;
Section Sweep: 10Hz-1000kHz;
Dimension: 31cm*15cm*5cm;
Net Weight: 4kg;
Display: 7 Inch LCD Screen;
Power Supply: 220V, 50Hz;
Delivery Lead Time: 7 Days After The Order Is Confirmed;
Shipping Method: Suggest to Ship by Express;
Trade Terms: EXW, Fob, DDU, CIF, etc.;
|