99热爱精品在线观看,人妻av中文字幕精品久久久,高清免费不卡一二三区视频,中文文字字幕视频制作,99久久国产精品热88人妻,在线不卡av片免费观看,欧美成人午夜在线观看,日韩制服丝袜中文字幕,亚洲国产精品av在线观看

Plastic Injection Water Filter Part Mould

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1 Set US$10,000.00

2+ Sets US$20,000.00

Sepcifications

  • Shaping Mode Injection Mould
  • Surface Finish Process Polishing
  • Mould Cavity Single Cavity
  • Plastic Material ABS
  • Process Combination Type Single-Process Mode
  • Application Household Appliances
  • Runner Cold Runner
  • Design Software Ug,Proe,CAD,Catia,Solidworks
  • Installation Fixed
  • Certification ISO
  • Standard DME
  • Customized Customized
  • Transport Package Wooden Case
  • Specification Dme
  • Trademark JSLMOULD
  • Origin China
  • Machine Equipment CNC,EDM,Wire Cutting Machine,Drilling Machine
  • Heat Treatment Nitriding
  • Mould Running Full Automaticity
  • Mould Steel 718 (34-38HRC)
  • Mould Life More Than 500K Shots
  • Mould Design Software Ug,Proe,CAD,Catia,Solidworks
  • Delivery Time 40 Days

Product Description

Product Name: plastic water filter part mould Product material: ABS Core&Cavity Steel: 718 Steel hardness: HRC34-38 Mould Standard: DME Cavity Number: 1*1 Injection System:direct gate Ejector System: ejector pin Cycle Time: 30 second Tooling lead time: 50DAYS Mould life: 500k SHOTS ...

Learn More

Water Filter Mould Comparison
Transaction Info
Price US$10,000.00-20,000.00 / Set US$15,000.00-30,000.00 / Set US$20,000.00-30,000.00 / Piece US$30,000.00-40,000.00 / Piece US$20,000.00-30,000.00 / Piece
Min Order 1 Set 1 Set 1 Piece 1 Piece 1 Piece
Payment Terms LC, D/P, T/T, PayPal, Small-amount payment, Western Union LC, D/P, T/T, PayPal, Small-amount payment, Western Union LC, D/P, T/T, PayPal, Small-amount payment, Western Union LC, D/P, T/T, PayPal, Small-amount payment, Western Union LC, D/P, T/T, PayPal, Small-amount payment, Western Union
Quality Control
Product Certification ISO ISO ISO ISO ISO
Management System Certification - - - - -
Trade Capacity
Export Markets North America, South America, Europe, Africa, Domestic, India, New Zealand North America, South America, Europe, Africa, Domestic, India, New Zealand North America, South America, Europe, Africa, Domestic, India, New Zealand North America, South America, Europe, Africa, Domestic, India, New Zealand North America, South America, Europe, Africa, Domestic, India, New Zealand
Annual Export Revenue - - - - -
Business Model Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM
Average Lead Time Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Product Attributes
Specification
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Household Appliances;
Runner: Cold Runner;
Design Software: Ug,Proe,CAD,Catia,Solidworks;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling Machine;
Heat Treatment: Nitriding;
Mould Running: Full Automaticity;
Mould Steel: 718 (34-38HRC);
Mould Life: More Than 500K Shots;
Mould Design Software: Ug,Proe,CAD,Catia,Solidworks;
Delivery Time: 40 Days;
Warranty: 1 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Commodity;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
After-sales Service: 2 Years;
Mould Quality Control: Professional QC in House;
Mould Runner System: Hot or Cold Runner System;
Mould Standard: Dme, Hasco, Lkm, etc;
Mould Design Software: Ug, Proe, Solidworks CAD, Ect;
Mould Cooling System: by Experienced Designer;
Mould Operating Mode: Automatically by CNC;
Mould Base: S50c,Lkm,Hasco;
Heat Treatment: Nitriding, etc;
Design Time: 7days;
Time of Warranty: 1 Year;
Warranty: 1 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Home Use;
Runner: Cold or Hot;
Design Software: UG;
Installation: Fixed;
Standard: Dme/Misumi/Hasco Ect;
Customized: Customized;
After-sales Service: Lifelong;
Mould Runner System: Hot Runner or Cold;
Mould Quality Control: Professional QC 25 Years;
Heat Treatment: Nitriding, etc;
Mould Base: S50c;
Mould Operating Mode: Automatically by CNC;
Mould Design Software: Ug, Proe, Solidworks CAD, Ect;
1 St Sample: 50-60days;
Design Time: 7 Days;
Delivery: 1 Week After Sample Confirm;
Warranty: 1 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Texture;
Mould Cavity: Single/Multiple;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Furniture;
Runner: Cold or Hot;
Design Software: Ug,PRO-E,Solidwork;
Installation: Fixed;
Standard: Dme/Hasco/Lkm;
Customized: Customized;
After-sales Service: 1 Year;
Offer You: ODM/OEM Service;
Provide: 3D Printing, Moldflow Analysia, Dfm Report;
Mould Base: S50c/C45;
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding;
Mould Quality Control: in House Control Professional QC 25 Years;
Heat Treatment: Nitriding;
Mould Surface: Chromed;
Mold Design: 7days After Deposit;
T1 Sample Time: 60days After Design Confrimed;
Delivery Time: 7 Days After Sample Confirm;
Warranty: 1 Year;
Shaping Mode: Injection Mould;
Surface Finish Process: Texture;
Mould Cavity: Single/Multiple;
Plastic Material: PP;
Process Combination Type: Single-Process Mode;
Application: Furniture;
Runner: Cold or Hot;
Design Software: Ug,PRO-E,Solidwork;
Installation: Fixed;
Standard: Dme/Hasco/Lkm;
Customized: Customized;
After-sales Service: Lifelong Service;
Mould Base: S50c/C45;
Mould Standard: Dme/Lkm Ect;
Machine Equipment: CNC,EDM,Wire Cutting Machine,Drilling/Grinding/Car;
Heat Treatment: Nitriding;
Mold Design: 7days After Deposit;
T1 Sample Time: 60days After Design Confrimed;
Mould Report: 7-10days;
Supplier Name

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

Diamond Member Audited Supplier