Min. Order Reference FOB Price
1 Piece Negotiable
Product Description
Product 1. Thyristor switches are used for dynamic switching of capacitors to meet fast, frequent dynamic power compensation system requirements, the thyristor switch in close to zero The thyristor switch conducts at near zero voltage and is turned off at zero current. 2. Conventional ...
| Transaction Info | |||||
|---|---|---|---|---|---|
| Price | Negotiable | US$22,800.00-22,857.00 / Set | US$305.00-310.00 / Piece | US$305.00-310.00 / Piece | US$940.00-950.00 / Piece |
| Min Order | 1 Piece | 1 Set | 1 Piece | 1 Piece | 10 Pieces |
| Payment Terms | LC, T/T, D/P, PayPal, Western Union, Small-amount payment | LC, T/T, PayPal, Western Union | LC, T/T, PayPal, Western Union | LC, T/T, PayPal, Western Union | LC, T/T, PayPal, Western Union | Quality Control |
| Product Certification | ISO9001, CCC | ISO9001, CCC | ISO9001, CCC | ISO9001, CCC | ISO9001, CCC |
| Management System Certification | ISO9001:2015, ISO45001:2018, ISO14001 | - | - | - | - | Trade Capacity |
| Export Markets | Domestic | Southeast Asia/ Mideast, Asia | Southeast Asia/ Mideast, Asia | Southeast Asia/ Mideast, Asia | Southeast Asia/ Mideast, Asia |
| Annual Export Revenue | - | - | - | - | - |
| Business Model | ODM, OEM | Own Brand, ODM, OEM | Own Brand, ODM, OEM | Own Brand, ODM, OEM | Own Brand, ODM, OEM |
| Average Lead Time | Peak Season Lead Time: one monthOff Season Lead Time: within 15 workdays | Peak Season Lead Time: one monthOff Season Lead Time: one month | Peak Season Lead Time: one monthOff Season Lead Time: one month | Peak Season Lead Time: one monthOff Season Lead Time: one month | Peak Season Lead Time: one monthOff Season Lead Time: one month | Product Attributes |
| Specification | |||||
| Supplier Name |
Shenzhen Great Energy Technology Co., Ltd.
|
Huainan Wantai Electric Co., Ltd.
|
Huainan Wantai Electric Co., Ltd.
|
Huainan Wantai Electric Co., Ltd.
|
Huainan Wantai Electric Co., Ltd.
|